Sumerpur, Pali. Authorities in the Sumerpur assembly constituency have launched a comprehensive strategy to mitigate drinking water shortages ahead of the upcoming summer season. Under the guidance of Cabinet Minister Joraram Kumawat, the Public Health Engineering Department has finalized a detailed action plan for the 2025-26 summer contingency period. This initiative aims to provide a sustainable water supply for both human consumption and the needs of local livestock across the region.
The proposed infrastructure project involves 115 distinct proposals with an estimated budget of 25.47 crore rupees. These works are part of a broader 56.78 crore rupee allocation for the entire Pali district. The primary objective is to strengthen local water sources to ensure that rural communities do not face scarcity during the peak heat months. Officials have prioritized the construction and commissioning of new tube wells alongside the renovation of existing water infrastructure.
Key technical improvements include the de-silting and deepening of old open wells, horizontal boring, and the repair of existing pump houses. Furthermore, the plan addresses the replacement of damaged rising lines and the integration of local water sources with overhead service reservoirs. These measures are designed to create a resilient distribution network capable of meeting the demands of the growing population and the significant cattle population in the area.


