Sapotra Residents Threaten Protest Over Inadequate Waterlogging Fix on MDR-111
Local residents in Sapotra are demanding a permanent solution to persistent waterlogging on the MDR-111 road after authorities attempted a temporary fix with a single trolley of gravel.
Sapotra, Karauli. Residents of Ward Number 5 in Sapotra are expressing deep frustration following an ineffective attempt by the Public Works Department to address severe waterlogging along the MDR-111 road. The stretch, extending from the sub-divisional office to the Durga Shah forest nursery, has become a major point of contention due to the lack of proper drainage systems. In response to public complaints, officials recently dumped a single trolley of gravel on the road, a measure that locals have dismissed as entirely insufficient for resolving the recurring issue.
The MDR-111 route serves as a critical artery connecting the Narayanpur-Tatwara region of Sawai Madhopur district to the prominent Trinetra Ganesh Temple. Because of its strategic importance, the road experiences heavy traffic from both local commuters and pilgrims. During the monsoon season, the accumulation of rainwater on the surface creates significant hazards for pedestrians and motorists alike, effectively paralyzing movement through the area.
Community members have raised serious concerns regarding the transparency of previous infrastructure projects. According to local accounts, official records suggest that drainage systems were constructed in the area, yet no such infrastructure is visible on the ground. This discrepancy has fueled allegations of administrative negligence and prompted calls for an immediate investigation into the alleged construction works that appear to exist only on paper.
The situation has reached a boiling point, with residents issuing a formal ultimatum to the local administration and the Public Works Department. They are demanding the immediate construction of functional drains and a comprehensive, permanent drainage plan to prevent future flooding. The community has warned that if the authorities fail to provide a viable solution within the next three days, they will launch a formal protest to ensure their grievances are addressed.
As the deadline approaches, the focus remains on whether the department will move beyond temporary patches to implement the structural improvements necessary for public safety. For now, the residents continue to navigate the waterlogged road, waiting for a commitment that goes beyond mere gravel and addresses the fundamental lack of infrastructure in their ward.
प्रतिक्रियाएं
टिप्पणियां
अभी कोई स्वीकृत टिप्पणी नहीं है।
